As the Tiger I drillship project came to completion, Opus Offshore made the decision to add the DTI active heave compensator to the existing CMC. This upgrade allows for more control during drilling operations and landing heavy equipment such as a BOP stack. DTI’s system is designed so that it can be implemented as part of an ongoing project or installed subsequently.